Power supply location area measures grant

For early days measures grant equivalency such as power supply locations

○For Reactor fuel cycle facility [country direct grant]     4,114,200 1,000 yen (from 2002 to 29)

  • For plutonium-uranium mixed oxide fuel fabrication plant     2,149,200 1,000 yen  
  • For next undergrounding facility        1,965,000 1,000 yen 

○Affect Higashidori Nuclear Power Plant [prefecture indirect grant]; 510,000 1,000 yen (from 1995 to 23) 

 

For power supply location promotion measures grant equivalency

○For Reactor fuel cycle facility [country direct grant] 25,247,367 1,000 yen (from 1988 to 26) 

  •  Uranium-enrichment facility              2,863,804 1,000 yen
  •  Low-level undergrounding facility           1,404,545 1,000 yen
  •  Reprocessing facility                  14,890,000 1,000 yen
  •  The low rebbe 2, high rebbe second      1,125,384 1,000 yen
  •  For plutonium-uranium mixed oxide fuel fabrication plant       4,963,634 1,000 yen 

○For Higashidori Nuclear Power Plant [prefecture indirect grant] 1,994,000 1,000 yen (from 1998 to 28)

○For middle storage facility [prefecture indirect grant]        86,000 1,000 yen (from 2012 to 26)

 

For fuel cycle facility grant equivalency

○Country direct grant 14,488,234 1,000 yen (from 2011 to 29)

  • Construction stage    8,886,904 1,000 yen
  • Driving stage    5,601,330 1,000 yen

 

For location local long-term development grant equivalency such as nuclear power generation facilities

○Country direct grant 3,314,900 1,000 yen (from 1997 to 22)

 

For neighboring local grant equivalency such as nuclear power generation facilities

○Prefecture indirect grant 9,168,489 1,000 yen (from 1993 to 29)

         (reference) House, atomic energy location benefit payment business [prefecture business] 6,229,022 1,000 yen 

              ※Operating cost is the grant result to village (from 1989 to 29)

 

Electricity prefectures to shift for grant equivalency

○Prefecture indirect grant 404,299 1,000 yen (from 1996 to 29)

 

 

Promotion measures grants such as power supply locations

Grants such as public information, investigation

○Prefecture indirect grant 805,291 1,000 yen (from 1981 to 2017) 

  • For Higashidori Nuclear Power Plant 140,409 1,000 yen (from 1981 to 2017)  
  • For Reactor fuel cycle facility 664,882 1,000 yen (from 1985 to 2017)   

 

Power supply area industry upbringing support subsidy

○Prefecture indirect grant 86,096 1,000 yen (from 1996 to 13) 

 

Fuel cycle grant

○Prefecture indirect grant 126,500 1,000 yen (from 2011 to 25)

  • It is 109,850 1,000 yen for MOX fabrication plant
  • For middle storage facility      16,650 1,000 yen

 

Power supply location area measures grant (special frame)

○Prefecture indirect grant 1 million 1,000 yen (from 2013 to 28)

 

 The past grant total sum

  61,345,376 1,000 yen  

  ※Promotion measures grant adding up sums such as power supply location area measures grant, power supply location